欢迎来到新航道官网!新航道-用心用情用力做教育!
新航道雅思APP 留学院校库

咨询热线:400-619-6509

常州新航道 > 雅思写作 > 支招小作文 | 一写就凉凉的流程图该咋写? 常州雅思培训班分享

支招小作文 | 一写就凉凉的流程图该咋写? 常州雅思培训班分享

来源:      浏览:      发布日期:2019-08-22 10:01

返回列表

今天的主题依旧是“流程图”。《剑14》里的流程图,是流程图的“集大成者”。


这个流程图同时具有两个种类的流程图的特点:既是制作/制造工序(发电)又有循环(水流是在发电厂里循环的)。


《剑14》小作文:流程图

☟☟☟

640.webp.jpg


The diagram below shows how electricity is generated in a hydroelectric power station.

Summarize the information by selecting and reporting the main features, and make comparisons where relevant.


于是,接下来的sample essay就遵循day and night and again 的 cycle 来写。


高分范文及解析

☟☟☟


The diagram is an illustration of how a hydroelectrical power plant works to generate electricity.

开始注意:制作/制造工序类型的流程图的词汇核心在于(但不限于)动词。


The dam obstructs the influx of water from the river and creates a reservoir at a great height. At the bottom of the dam is an entry point that is open during the day and through which water flows into the tunnel, which leads to the reversible turbines, which spins. The spinning produces power that operates the electricity generator. 「独立的重要步骤不拿定语从句写,而是单独写一个句子/或者是状语从句。」At this point, electricity is produced. Electricity is then transmitted via the power lines to the national grid and to households, manufacturers and businesses.

In addition, water goes into a low-level reservoir, and during the night, water flows inversely through the way it flows down to the intake point, which is closed at night, and back to the high-level reservoir. As a new day starts, water is let down again.

总结制作/制造工序类型的流程图的核心在于:描述简单或者复杂程度。

Overall, electricity production with hydraulic power is not a complex procedure, with simple apparatus. 


更多关于常州雅思常州托福的内容,请在线咨询常州新航道老师哦!


新航道常州学校官网:https://cz.xhd.cn/


新航道常州学校咨询热线:0519-86637799

咨询热线
400-619-6509
集团客服电话
400-097-9266

常州新航道学校:钟楼区延陵西路119号南大街商业步行街2楼201-207室(星巴克咖啡泰富店对面)